5. Integration and verification of security and resiliency tools

Objectives

·       To integrate tools and techniques in a global framework aiming to assure security and resiliency of heterogeneous networks.

·       To verify the effectiveness and reliability of the developed framework

 

Description

The output of the work package will be a prototypical implementation of the INTERSECTION framework, integrating components and tools designed and realised by WP3 and WP4 teams. In fact, taking into account the inputs received from the previous work packages, design guidelines, methodologies and hardware and software components, this work package will implement an integrated framework of the whole INTERSECTION system. The following activities are foreseen:

 

Task 5.1: Definition of testbed specification

The WP5 team will work in strict contact with the other teams, mainly with those involved in the development activities and the integrated framework specification, in order to coordinate the detailed specification and implementation of hardware and software interfaces and to produce a testbed specification.

Task 5.2: Implementation of the INTERSECTION testbed

The team will implement the Project test-bed in order to be ready for integration, verification, validation and demonstration activities.

Task 5.3: Integration of produced tools and components

The tools and components produced by the previous work packages will be integrated according with the produced guidelines, methodologies and architectural designs.

Task 5.4: Technological verification

All produced components and devices and the integrated system will be verified. Tasks for this activity will be the following: preparation of the verification plan; devices, components and system prototype verification (execution of structured system testing) by means of the complete test bed realised at the WP leader premises (laboratory tests); completion of the verification report to be included in the Project Integration Report.

 